Preparing procedures qualifications project IHC fabrication

The De Klerk company managed to acquire a part of a large IHC contract. The assignment consists of the assembly and welding of plate fields Grade EH-36
material by means of flux-cored arc welding FCAW(M)  and submerged arc welding (SAW). Before starting this  project under DetNorske Veritas a large number of
qualifications needed to be welded according to the DNV OS-C401 specification. I was assigned by De Klerk to carry out the entire assistance­ of the process and after positive results a start with the welding activities  was made immediately.